EPACKPEBEPack Prefab Technologies Ltd.

    EPACK Prefab Technologies starts production at Ghiloth plant in Rajasthan

    • Guidance
    • Pre-engineered buildings and PUF panels

    Blacklitt Research3 min read

    An aerial view of a large steel frame building under construction on bare ground.
    Wikideas1, via Wikimedia Commons (CC0). Illustrative image.

    EPACK Prefab Technologies (NSE: EPACKPEB) has commenced commercial production of pre-engineered buildings and PUF panels at its Ghiloth facility in Rajasthan with effect from 28 Oct 2026, it said in a filing on 28 Oct 2026. The company says its installed capacity stands enhanced with the commencement, and it proposes to add 11,300 metric tons a year of PEB structures and 8,00,000 square meters a year of PUF panels.

    Key highlights

    • Commercial production with effect from: 28 Oct 2026
    • Proposed PEB structures capacity addition: 11,300 metric tons a year
    • Proposed PUF panel capacity addition: 8,00,000 square meters a year
    • Investment required: around ₹100 crore, financed from IPO net proceeds

    Sign up to continue reading

    Create a free account to read the rest of this article and the analysis that follows.

    Disclaimer:

    The information available on this article is provided for education and informational purposes only. It does not constitute or provide financial, investment or trading advice and should not be construed as an endorsement of any specific stock or financial strategy in any form or manner. We do not make any representations or warranties regarding the quality, reliability, or accuracy of the information provided. This website may contain links to third-party content. We are not responsible for the content or accuracy of these external sources and do not endorse or verify the information provided by third parties. We are not liable for any decisions made or actions taken based on the information provided on this website.

    Latest posts

    Add Blacklitt as preferred source