WAAREERTLWaaree Renewable Technologies Limited

    Waaree Renewable Technologies gets a PSU letter of acceptance for a 5 MWp solar project with 10-year O&M

    • Order win
    • Solar

    Blacklitt Research1 min read

    Rows of ground-mounted solar panels on a grassy site
    Illustrative image. Photo: Janezdrilc, via Wikimedia Commons (CC0)

    Waaree Renewable Technologies Limited has told the exchanges on 8 Oct 2026 that it received a Letter of Acceptance, at 4:27 PM, from a public sector undertaking for turnkey engineering, procurement and construction of a 5 MWp grid-connected solar PV project, along with operation and maintenance for 10 years.

    The EPC work is to be completed within 12 months of the letter, followed by the 10-year maintenance period. The company does not name the customer, gives the order size as 5 MWp and not a rupee value, and says its promoters have no interest in the customer.

    Inference

    The order is small in capacity and, with no value given, its revenue contribution cannot be worked out from the filing. The 10-year maintenance term would add a long period of service work after construction.

    Reference: Original filing (PDF)

    Disclaimer:

    The information available on this article is provided for education and informational purposes only. It does not constitute or provide financial, investment or trading advice and should not be construed as an endorsement of any specific stock or financial strategy in any form or manner. We do not make any representations or warranties regarding the quality, reliability, or accuracy of the information provided. This website may contain links to third-party content. We are not responsible for the content or accuracy of these external sources and do not endorse or verify the information provided by third parties. We are not liable for any decisions made or actions taken based on the information provided on this website.

    Related posts