NCC wins a ₹1,286 crore order from Hyderabad Growth Corridor for Radial Road-2, Package 1
- Order win
- Construction

NCC Limited has told the exchanges on 8 Oct 2026 that it has received a Letter of Acceptance dated 8 Oct 2026 from Hyderabad Growth Corridor Limited for the construction of Radial Road-2 from the Outer Ring Road near Budwel to Nacharam on NH-167N, Package-1 from Budwel to Shabad, in Telangana.
The contract value is ₹1,286.03 crore excluding GST, with a construction period of 18 months. It is a domestic order, and the company classifies it as a major order.
Inference
At ₹1,286.03 crore over 18 months, the order is large relative to a single project. The value excludes GST, so the amount billed would be higher.
Reference: Original filing (PDF)
Disclaimer:
The information available on this article is provided for education and informational purposes only. It does not constitute or provide financial, investment or trading advice and should not be construed as an endorsement of any specific stock or financial strategy in any form or manner. We do not make any representations or warranties regarding the quality, reliability, or accuracy of the information provided. This website may contain links to third-party content. We are not responsible for the content or accuracy of these external sources and do not endorse or verify the information provided by third parties. We are not liable for any decisions made or actions taken based on the information provided on this website.

